Guide describing methods for short-term control of erosion during construction and long-term measures for controlling erosion on sloped sites or sites with river banks or shore lines.
Vapor retarder plastic should not be installed over fibrous insulation on basement or crawlspace walls unless rigid foam or spray foam is installed directly against the concrete, behind the blanket insulation.
This guide describes procedures for assessing feasibility of solar resources, and designating location of propolsed PV arrays and solar thermal panels.
Overview guide describing wildfire risks and construction strategies to increase the wildfire resistance of homes located in wildland urban interface areas.