Guide describing how to insulate the sill beam or sill plate on the exterior side in a way that allows drying to the exterior, as part of an exterior wall upgrade.
Report providing extensive guidance on controlling moisture in building envelopes through proper selection and installation on air, water, thermal, and vapor barriers.
Document covering basic moisture control principles in the design of above-grade building enclosures; driving rain as a moisture load on walls; a classification system of the various rain control strategies available for walls; and good design practises for walls.
Guide describing how to install a capillary break under a slab foundation using either polyethylene sheeting or rigid insulation installed over aggregate or over sand and geotextile matting.
Vapor retarder plastic should not be installed over fibrous insulation on basement or crawlspace walls unless rigid foam or spray foam is installed directly against the concrete, behind the blanket insulation.