Case study describing a stand-off furring strategy that minimizes the physical connections to each existing wall stud, uses spray foam to encapsulate existing siding materials (including lead paint), and creates a vented rain screen assembly to promote drying.
Article describing the importance of air sealing, insulation, and roof ventilation in reducing the likelihood of ice dam formation on roofs in cold snowy climates.
Article from Montana State University Extension explaining how proper insulation techniques can greatly reduce the risks of ice dams on roofs in cold climate zones.