Report providing extensive guidance on controlling moisture in building envelopes through proper selection and installation on air, water, thermal, and vapor barriers.
Vapor retarder plastic should not be installed over fibrous insulation on basement or crawlspace walls unless rigid foam or spray foam is installed directly against the concrete, behind the blanket insulation.