Skip to main content

Case Studies

Showing results 201 - 242 of 242

Author(s)
Gilbride Theresa L,
Pacific Northwest National Laboratory
Organization(s)
PNNL,
U.S. Department of Energy,
DOE
Publication Date
Description
Case study poster describing a DOE Zero Energy Ready Home 2024 Housing Innovation Award winning custom home in the cold climate that achieved an ERI of 33 without PV and an ERI of 10 with PV.
Author(s)
Building Science Corporation
Organization(s)
BSC
Publication Date
Description
Case study describing a building project in the cold and very-cold climate zones.
Author(s)
Building Science Corporation
Organization(s)
BSC
Publication Date
Description
Case study describing a building project in the cold and very-cold climate zones.
Author(s)
Gilbride Theresa L
Organization(s)
PNNL
Publication Date
Description
Case study describing Tindall Homes and the energy efficient features they took advantage of when building 20 luxury homes, that subsequently used 40% less energy then code requirements.
Author(s)
Pacific Northwest National Laboratory
Organization(s)
PNNL
Publication Date
Description
Case study describing the family-run Treasure Homes that achieved a HERS rating of 46 without PV on its prototype “Gem” home, located on the blustery shores of Lake Michigan in northern Indiana.
Author(s)
IBACOS
Organization(s)
IBACOS
Publication Date
Description
Case study describing a stand-off furring strategy that minimizes the physical connections to each existing wall stud, uses spray foam to encapsulate existing siding materials (including lead paint), and creates a vented rain screen assembly to promote drying.