Showing results 1 - 8 of 8
Composition shingle roofing system showing sheathing and hot-mopped underlayment
Expanded polystyrene insulation is installed with joints taped and lath attached in preparation for the application of stucco
Right: All joints in the rigid foam are taped to keep stucco out of joints for even drying. Mesh tape (shown here) is used with expanded polystyrene (EPS); acrylic sheathing tape or self-adhered membrane is used with XPS
Spray foam adhesive provides an extra water resistant layer to the joints and seams on the inside of attics.
Stucco is installed over rigid insulation, which is installed over a drainage plane consisting of a drainage gap and building wrap layer over the sheathing
Upper-floor tie to lower floor for two-story building. Floor tie anchor and nailed wall sheathing.