Case study describing the Green Home 3 project, which achieved a 44% whole-house energy savings over the Building America New Construction B10 Benchmark, DOE Zero Energy Ready Home certification, and National Green Building Standard Gold-level certification.
Case study describing a builder in Georgia that designs energy-efficient homes for a green community, yielding homes with HERS scores as lowas 59 and electric bills as low as $50 a month.
Case study describing a new construction building project of 20 luxury homes in northern New Jersey that were more energy efficient than ENERGY STAR and met the 50% energy savings requirements of the federal tax credit for new homes.
Case study describing the growth of a Manassas-based home performance company that increased their annual number of projects from 13 to 79 between 2007 and 2012.
Case study describing a heating system retrofit in an existing apartment building complex which included advanced boiler controls and reduced heating gas consumption by about 20%.
Case study describing steps for properly designing a hydronic system for setback operation, which are applicable to new construction and retrofit applications.
Case study describing a package of energy- efficiency measures for new manufactured homes in the Pacific Northwest, including triple-pane highly efficient windows.
Case study describing the best practices, costs, and savings associated with balancing steam distribution systems through increased main line air venting, radiator vent replacement, and boiler control system upgrades.