Case study describing the Green Home 3 project, which achieved a 44% whole-house energy savings over the Building America New Construction B10 Benchmark, DOE Zero Energy Ready Home certification, and National Green Building Standard Gold-level certification.
An entirely new section in the 2015 IECC/IRC regarding fuel-burning appliances basically requires the appliance to be isolated from the building thermal envelope, located either outside or within a separate room if the fuel-burning appliance is supplied by open combustion air ducts. This brief provides an overview of the requirements and further details of approving the actual "room".