Guide describing how to air-seal and insulate a ceiling where the insulation is installed on top of the ceiling (on the attic floor) in a vented attic.
Table adapted from Table R402.1.1 in the 2009 and 2012 IECC and Table R402.1.2 in the 2015 and 2018 IECC (Table N1102.1 in 2009 IRC, Table 1102.1.1 in 2012 IRC, and Table N1102.1.2 in 2015 and 2018 IRC).
An entirely new section in the 2015 IECC/IRC regarding fuel-burning appliances basically requires the appliance to be isolated from the building thermal envelope, located either outside or within a separate room if the fuel-burning appliance is supplied by open combustion air ducts. This brief provides an overview of the requirements and further details of approving the actual "room".
Webinar from Keenan Watson and Samantha Kambo of DuPont on how to correctly install a weather-resistant barrier on a home for code compliance effectiveness. Free EEBA login required.
Part I of the Guide addresses walls constructed with 2x6 wood frame studs, wood structural panel (WSP) sheathing as exterior sheathing, gypsum board as interior sheathing, and a cladding system installed over WSP sheathing in low-rise residential buildings up to three stories in height. Walls with...
Case study describing the Green Home 3 project, which achieved a 44% whole-house energy savings over the Building America New Construction B10 Benchmark, DOE Zero Energy Ready Home certification, and National Green Building Standard Gold-level certification.