High-performance manufactured homes are built using proven best practices for durability, comfort, indoor air quality, and energy efficiency. The how-to guidance provided here presents practical and effective methods for implementing key details, both inside the factory and in the field.

This guidance was created in collaboration with Northwest Energy Works. Special thanks go to the manufacturing plants that allowed photography and video footage of work processes to be taken during plant operation.

Factory Installed Measures

Insulation and Reduced Thermal Bridging

          Cut Batts to Fit Irregular Cavities [Job Process Sheet]  [Video]        

          Split and Notch Batts to Fit around Wires and Electrical Boxes [Job Process Sheet]  [Video]

Air Sealing

          Measure 1 [Job Process Sheet]  [Video]

Mechanical Ventilation System Design

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Duct Quality Installation

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Local Mechanical Exhaust

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Air Filtration

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Combustion Appliances

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Air Circulation

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Hot Water Distribution Efficiency, Water Fixtures

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Water-Managed Building Assembly

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Water-Managed Building Materials

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Moisture Control

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

HVAC System

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Materials

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

Final Measures (prior to occupancy)

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

PV-Ready

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]


Field-Installed Measures

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]

          Measure 1 [Job Process Sheet]  [Video]        

          Measure 2 [Job Process Sheet]  [Video]