Showing results 1 - 12 of 12
Install the house wrap. Cut house wrap to fit over diverter and tape top of cut wrap
Right - A continuous load path connects the roof and wall framing to the foundation.
Right-Wall-insulating sheathing is extended up to roof rafters and sealed around the framing with spray foam
Unvented roof assembly at eave retrofitted with rigid foam, spray foam, and taped top edge of existing house wrap or building paper