Showing results 1 - 4 of 4
A home is tested at two points for enclosure air leakage
Construction defects are exponentially cheaper to fix in the design stage rather than waiting to deal with them until after construction is complete (Source: American Contractors Insurance Group, Inc. 2009).
The Integrated Design Process loops in design input at every stage of development
The proccess for building a prototype of a high-performance home encourages ongoing interaction with the energy rater, engineer, architect, and HVAC contractor (Source: PNNL).