Showing results 1 - 7 of 7
Clean taping areas and install 3" tape on vertical joint of upper insulation overlapping the horizontal joint
Expanded polystyrene insulation is installed with joints taped and lath attached in preparation for the application of stucco
Right – Windows are installed and flashed in the factory for these modular homes.
Right: Flashing the butt joints in lap siding installations is a better practice than relying on caulk to seal the joints.
Tape the joint between the top insulation sheet and the Z-flashing with 2" wide tape to improve air tightness