Log in or register to create Field Kits and Sales Worksheets. Why register?

A termite shield and a sill gasket are installed between the sill plate and the foundation on a raised slab foundation

Author(s): Baechler, Gilbride, Hefty, Cole, Adams, Butner, Oritz, Love
Organization(s): Pacific Northwest National Laboratory, Oak Ridge National Laboratory

Report describing measures that builders in mixed-humid climates can use to build homes that have whole-house energy savings of 40% over the Building America benchmark with no added overall costs for consumers.