Case study describing a Concord Cape Cod style home designed in August 2008 by architects and engineers at Building Science Corporation, who developed the drawing set and specifications for the high performance custom home in Concord, Massachusetts.
Case study describing a DOE Zero Energy Ready Home 2013 Housing Innovation Award Winning production home in Devens MA that scored HERS 35 without PV or HERS -37 with PV.
Case study describing a DOE Zero Energy Ready Home 2013 Housing Innovation Award winning custom home in Devens MA that scored HERS 34 without PV or HERS -21 with PV.
Case study describing a DOE Zero Energy Ready Home 2013 Housing Innovation Award winning custom home in Downers Grove IL that scored HERS 35 without PV.
Case study describing a 4,763 ft2 certified Passive House that achieved HERS 27 without PV through the construction of R-54 walls that use ICF plus fiberglass cavity insulation, an R-100 vented attic, extensive air sealing and flashing, triple-pane windows, ductless heat pumps, and solar hot water.
Case study describing the Green Home 3 project, which achieved a 44% whole-house energy savings over the Building America New Construction B10 Benchmark, DOE Zero Energy Ready Home certification, and National Green Building Standard Gold-level certification.
Case study describing a package of energy- efficiency measures for new manufactured homes in the Pacific Northwest, including triple-pane highly efficient windows.