Case study describing a DOE Zero Energy Ready Home 2014 Housing Innovation Award winner that scored HERS 45 without PV and 32 with PV and is the first home in the world to use a tri-generation system to supply electricity, heating, and cooling on site.
Case study describing a basement retrofit of a 1916 home in Madison, Wisconsin that involved installing dimple drain mat and closed-cell spray foam on interior of basement wall and an interior footing drain to manage moisture before finishing an existing basement.