Case study describing the performance of a small-diameter, high-velocity heat pump system compared to a conventional system in two identical new construction triplex townhouses.
Case study describing a new construction project designed to achieve an 87% reduction in source energy use when compared to the 2009 Building America Benchmark.
Case study describing steps for properly designing a hydronic system for setback operation, which are applicable to new construction and retrofit applications.