Guide describing how to air-seal and insulate a ceiling where the insulation is installed on top of the ceiling (on the attic floor) in a vented attic.
The intent of this brief is to provide code-related information about controlling moisture in unvented attics by installing a vapor diffusion port/vent that would convey water vapor from an unvented attic to the outside when air-permeable insulation materials are installed and can be verified as being in compliance with the related codes and standards for residential construction. Providing consistent information to document compliance with codes and standards to all relevant parties responsible for verifying compliance (e.g., code officials, builders, contractors, designers, etc.) is expected to result in increased compliance and more timely, less challenging and more uniform plan review and field inspections.
The intent of this brief is to provide code-related information about sealing and insulating existing vented attics to help ensure that the measure will be accepted as being in compliance with the code. Providing the same information to all interested parties (e.g., code officials, builders, contractors, designers, etc.) is expected to result in increased compliance and fewer innovations being questioned at the time of plan review and/or field inspection.
The intent of this brief is to provide code-related information about heat recovery ventilation to help ensure that what is proposed regarding the heat recovery ventilator ‘product’ itself as well as ventilation measures can be verified as being in compliance with the code. Providing consistent information to document compliance with codes and standards to all relevant parties responsible for verifying with those codes and standards (e.g., code officials, builders, contractors, designers, etc.) is expected to result in increased compliance and more timely, less challenging and more uniform plan review and field inspections.
The intent of this brief is to cover the new requirements for new wood-burning fireplaces regarding doors, dampers, and combustion air and proper ventilation.
The intent of this brief is to provide code-related information about properly sealing heating, ventilating, and air conditioning (HVAC) register boots to help ensure that what is proposed regarding sealing the register boot will be accepted as being in compliance with the code. Providing consistent information to document compliance with codes and standards to all relevant parties responsible for verifying with those codes and standards (e.g., code officials, builders, contractors, designers, etc.) is expected to result in increased compliance and more timely, less challenging and more uniform plan review and field inspections.
The intent of this brief is to provide code-related information about buried ducts in vented attics to help ensure that the measure will be accepted as being in compliance with the code. Providing notes for code officials on how to plan review and conduct field inspections can help provide jurisdictional officials with information for acceptance. Providing the same information to all builders, designers, and others is expected to result in increased compliance and fewer innovations being questioned at the time of plan review and/or field inspection.
Webinar answering code-related questions on duct leakage tests, moisture levels in attics and crawlspaces, combustion equipment in conditioned attics, ventilation in multifamily buildings, and continuous insulation in residential construction.
The intent of this brief is to provide code-related information for aerosol sealing building enclosures to achieve durable air tightness levels that will be accepted as being in compliance with the code.
The intent of this brief is to provide code-related information about gas-fired boilers to help ensure that the measure will be accepted as being in compliance with the code. Providing notes for code officials on how to plan reviews and conduct field inspections can help builders or remodelers...
An entirely new section in the 2015 IECC/IRC regarding fuel-burning appliances basically requires the appliance to be isolated from the building thermal envelope, located either outside or within a separate room if the fuel-burning appliance is supplied by open combustion air ducts. This brief provides an overview of the requirements and further details of approving the actual "room".
The intent of this brief is to provide code-related information about ductless mini-split heat pumps to help ensure that the measure will be accepted as being in compliance with the code.
This brief discusses the provisions in the 2015 International Energy Conservation Code (IECC) and International Residential Code (IRC) related to evaporative cooling.
The focus of this brief is on boiler efficiency, sizing requirements, controls, combustion air, and pipe insulation for the 2015 version of the IRC/IECC.
From a model code perspective, submittal of construction documentation, permitting, plan review, and field inspection may be required depending upon the specific details of renovating the floor above an unconditioned space (e.g., floor over a vented crawl space). Several different approaches can be taken to seal and insulate existing floors during a renovation project.