Drawing 4A.1: IECC CZ 4A: SIP Roof, SIP Wall, Stem Wall, Slab on Grade

  • This wall and roof assembly is constructed using structural insulated panels (SIPs).
  • It is important to seal the interior joints of the SIP roof panels to provide air control layer continuity.
  • Many code officials do not count SIPs as continuous insulation when applying Table R402.1.3 of the 2021 IECC. Hence, the R-values shown in the drawing are based on the cavity insulation requirements of this table. However, SIPs walls and roofs typically have much lower framing factors than typical framed walls, resulting in less thermal bridging. For these reasons, it may be most appropriate to use the U-factor table (Table R402.1.2) or the UA alternative (Section R402.1.5) for code compliance rather than using prescriptive R-values. U-factor should account for the thermal bridging of the assembly.
  • Note that this assembly does not have an attic (vented or unvented). If the assembly did have an attic space, Section R402.2.1 of the 2021 IECC may apply, depending on the interpretation of the local code official. If so, R-49 could be used over the attic rather than R-60 as long as the R-49 insulation extended over the full width of the exterior wall top plate.
  • A drainage plane should be created behind the siding by using a draining house wrap or furring strips. Furring strips only need to create a gap of at least 1/4", so a material such as sill gasket strips installed vertically can be used in place of typical wood furring.
  • The function of the masticed membrane strip under the sill plate is to control entry of termites. It must be fully adhered.  Some termite control approaches use a strip of stainless-steel mesh embedded in mastic.
  • Portions of the CMU wall may need to be filled solid to meet structural requirements or to accommodate anchor bolts for a sill plate.
  • The entire below-grade portions of the stem wall should be coated with dampproofing to control capillary uptake.

Disclaimer

This content is a work created with funding provided by the United States Department of Energy under Contract no DE-AC05-076RL01830 for the operation of Pacific Northwest National Laboratory. The information and guidance provided by Pacific Northwest National Laboratory (PNNL) in the content are intended solely for educational purposes only and do not constitute formal training or certification. It is provided with the explicit understanding that neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. Viewers assumes full responsibility for all actions that they may take from information provided in this content including ensuring the safety, code compliance, and proper functionality of any products they choose to install. Installation and use of such products should be performed in accordance with local regulations and manufacturer instructions.