Image Right – The entire first floor and second floor of these modular homes were assembled in the factory and installed on an insulated concrete basement foundation on site. Publication Date Thu, 09/30/2021 - 12:00
Image Right – Two inches of rigid foam was installed on the ground before pouring the basement floor slab while precast, pre-insulated concrete panels comprise the basement walls. Publication Date Thu, 09/30/2021 - 12:00