Skip to main content

Showing 1 - 3 of 3 results:

Publication Date
·
Author(s)
Nigro Nick,
et al.
·
Organization(s)
Atlas Public Policy,
NYSERDA,
New York State Energy Research and Development Authority
Description
Report describing the business case of hosting a Level 2 electric vehicle (EV) charging station in New York, including analysis of real-world data on equipment use, costs, revenue, and assumptions derived from industry reports and original research.
Publication Date
·
Author(s)
Metal Sales Manufacturing Corporation
·
Organization(s)
MS Manufacturing Corporation
Description
Installation manual for installing metal panel siding.
Publication Date
·
Author(s)
Kochkin Vladimir,
Wiehagen Joseph
·
Organization(s)
U.S. Department of Energy,
DOE
Description
The Guide addresses walls constructed with 2x4 wood frame studs, wood structural panel sheathing (WSP) as wall bracing and added backing for foam sheathing, a layer of rigid foam sheathing insulation up to 1.5 inches thick over the WSP, and a cladding system installed over the foam sheathing in low...