Showing 1 - 8 of 8 results:
Publication Date
·
Author(s)
Deer Charlie,
et al.
·
Organization(s)
University of Alaska,
Alaska Housing Finance Corporation
Description
Manual describing best practices or home construction in Alaska and northern climates.
Publication Date
·
Author(s)
Hendron Robert
·
Organization(s)
National Renewable Energy Laboratory,
NREL,
U.S. Department of Energy,
DOE
Description
Document describing the Building America research benchmark for the residential building program.
Publication Date
·
Author(s)
Johns Manville
·
Organization(s)
Johns Manville
Description
Information sheet providing detail about hand fabrication of a one-piece straight duct from a 48" x 120" x 1" thick (1.22 m x 3.05 m x 25 mm) sheet where the total inside duct dimensions equals 112" (2.84 m) or less.
Publication Date
·
Author(s)
Florida Division of Emergency Management
·
Organization(s)
Florida Disaster
Description
Guide describing retrofit procedures for gable end roofs.
Publication Date
·
Author(s)
Federal Emergency Management Agency
·
Organization(s)
FEMA
Description
Report providing a collection of fact sheets describing guidance for constructing homes in wildfire zones.
Publication Date
·
Author(s)
Guertin Mike
·
Organization(s)
Fine Homebuilding Magazine
Description
Article describing the second step of a three-step process for the installation a tubular skylight, using peel-and-stick flashing tape instead of roof cement, and integrating the roof underlayment with the flashing.
Publication Date
·
Author(s)
Lubliner Michael,
et al.
·
Organization(s)
WSU Extension Energy Program,
Washington State Department of Community Trade and Economic Development
Description
Conference paper making the case that moving ducts to conditioned space saves energy, is practical for production builders (when accompanied by careful pre-planning), and creates significant andmarketable energy savings for homebuyers.
Publication Date
·
Author(s)
Moyer Neil,
et al.
·
Organization(s)
Florida Solar Energy Center,
FSEC,
Calcs Plus
Description
Document presenting results from testing prototype HVAC duct system designs that would locate the entire length of duct work within the air and thermal barriers of the building envelope. These include one that incorporated a high-side supply register, one that utilized a single soffit located within...