EERE »
BTO »
Building America »
Solution Center Home
» Image Gallery
» This heated garage plenum space is insulated along its top, bottom and sides, and the insulation at the top of the plenum meets IECC requirements. The insulation along the top and sides is fully aligned with an air barrier.