Wrong – No air barrier installed prior to tub installation

Wrong – No air barrier installed prior to tub installation
Wrong – No air barrier installed prior to tub installation
Author(s): EPA
Organization(s): EPA
Guide describing details that serve as a visual reference for each of the line items in the Thermal Enclosure System Rater Checklist.