Case study describing a multi-family town home project constructed for the City of Aspen, Colorado, with assistance from the U.S. DOE Building America research team Building Science Corporation and the National Renewable Energy Laboratory.
Case study describing the performance of a small-diameter, high-velocity heat pump system compared to a conventional system in two identical new construction triplex townhouses.
Case study describing a new construction project designed to achieve an 87% reduction in source energy use when compared to the 2009 Building America Benchmark.
Case study describing steps for properly designing a hydronic system for setback operation, which are applicable to new construction and retrofit applications.